MXLIST.NET - daydreamsproject.com
Search for IP or hostnames:
daydreamsproject.com checked at 2025-11-17T11:44:22.697Z 1148ms 82/82/82 100% R:8 allDone:true timedOut:false daydreamsproject.com
| NS | ns71.domaincontrol.com | ||||||
| A | 2603:5:2194::2e 🇺🇸 GODADDY-DNS-GLOBAL | ||||||
| PTR | ns71.domaincontrol.com | ||||||
| A | 97.74.105.46🇺🇸 GODADDY-DNS-GLOBAL | ||||||
| PTR | ns71.domaincontrol.com | ||||||
| NS | ns72.domaincontrol.com | ||||||
| A | 2603:5:2294::2e 🇺🇸 GODADDY-DNS-GLOBAL | ||||||
| PTR | ns72.domaincontrol.com | ||||||
| A | 173.201.73.46🇺🇸 GODADDY-DNS-GLOBAL | ||||||
| PTR | ns72.domaincontrol.com | ||||||
| MX | mailstore1.secureserver.net | ||||||
| A | 92.204.80.3🇫🇷 GODADDY-SXB | ||||||
| PTR | sxb1plibsmtp01-v02.prod.sxb1.secureserver.net | ||||||
| MX | smtp.secureserver.net | ||||||
| A | 92.204.80.0🇫🇷 GODADDY-SXB | ||||||
| PTR | sxb1plibsmtp01-v01.prod.sxb1.secureserver.net | ||||||
| A | 3.33.130.190🇺🇸 Amazon | ||||||
| PTR | a2aa9ff50de748dbe.awsglobalaccelerator.com | ||||||
| A | 15.197.148.33🇺🇸 Amazon | ||||||
| PTR | a2aa9ff50de748dbe.awsglobalaccelerator.com | ||||||
com
Starts with same word
daydreamsproject.com |
Starts similarily
daydreamsproject.com |
AI analysis
daydreamsproject.com points to two IPs: 3.33.130.190 and 15.197.148.33.
Other host names, for instance explainmeme.com, sajeel.org, reliancespa.in, amcored.com and tsihcorp.com share IP numbers with daydreamsproject.com.
Two name servers ns71.domaincontrol.com and ns72.domaincontrol.com are delegated to daydreamsproject.com.
daydreamsproject.com uses the same name server configuration as other domains, such as cpap.expert, top3ds.com, magic-mushroom-growkits.net, itzinger.com and fajl.me.
Host names with two IPs:
ns71.domaincontrol.com points to 2603:5:2194::2e and 97.74.105.46.
ns72.domaincontrol.com points to 2603:5:2294::2e and 173.201.73.46.
Two mail servers handle daydreamsproject.com: mailstore1.secureserver.net and smtp.secureserver.net.
daydreamsproject.com shares the same mail server setup as other domains, including edmontondemo.com, ranchoperformancecenters.net, locertified.com, vacanzepersingle.com and img.pictures.
daydreamsproject.com shares some mail servers with other domains, at least partially, for instance idolcult.com.
Host names with a single IP address:
mailstore1.secureserver.net points to 92.204.80.3
smtp.secureserver.net points to 92.204.80.0