CF1761121775576-tsm20251017082432

MXLIST.NET - bmsprojects.co.za

Search for IP or hostnames:

bmsprojects.co.za checked at 2025-10-22T08:29:35.550Z 305ms 154/154/154 100% R:13

bmsprojects.co.za

NSns.otherdns.com
A2001:19f0:7400:1a54:5400:3ff:fee2:36a5 ๐Ÿ‡ฌ๐Ÿ‡ง The Constant Company
A41.215.232.12๐Ÿ‡ฟ๐Ÿ‡ฆ RSAWEB
PTRns.otherdns.com
A104.238.171.99๐Ÿ‡ฌ๐Ÿ‡ง The Constant Company
PTR104.238.171.99.vultrusercontent.com
NSns.otherdns.net
A2001:19f0:6402:4eb:5400:1ff:fea2:bf1f ๐Ÿ‡บ๐Ÿ‡ธ The Constant Company
A149.28.240.39๐Ÿ‡บ๐Ÿ‡ธ The Constant Company
PTRns.otherdns.net
A154.0.6.120๐Ÿ‡ฟ๐Ÿ‡ฆ Cool Ideas
MXaspmx.l.google.com
A2607:f8b0:4023:c06::1b ๐Ÿ‡บ๐Ÿ‡ธ Google
PTRdz-in-f27.1e100.net
A142.250.141.26๐Ÿ‡บ๐Ÿ‡ธ Google
PTRdd-in-f26.1e100.net
NSns.dns1.co.za
A2406:da11:f5d:500:bbed:25d3:3efe:555a ๐Ÿ‡ฟ๐Ÿ‡ฆ Amazon
A13.245.235.13๐Ÿ‡ฟ๐Ÿ‡ฆ Amazon
PTRec2-13-245-235-13.af-south-1.compute.amazonaws.com
A169.1.2.99๐Ÿ‡ฟ๐Ÿ‡ฆ Afrihost
PTRns.dns1.co.za
NSns.dns2.co.za
A2c0f:f4c0:2000:100::53 ๐Ÿ‡ฟ๐Ÿ‡ฆ Afrihost
PTRns.dns2.co.za
A102.37.116.18๐Ÿ‡ฟ๐Ÿ‡ฆ Microsoft
A197.242.144.5๐Ÿ‡ฟ๐Ÿ‡ฆ Afrihost
PTRdns2.afrihost.com
PTRns1.asfym.co.za
PTRns2.dns1.co.za
PTRns.dns2.co.za
PTRdns2.saeverything.co.za
PTRns2.yourdomain.co.za
MXalt1.aspmx.l.google.com
A2a00:1450:4013:c1e::1a ๐Ÿ‡ณ๐Ÿ‡ฑ Google
PTRyugrqzs-in-f26.1e100.net
A192.178.213.26๐Ÿ‡บ๐Ÿ‡ธ Google
PTRyugrqzs-in-f26.1e100.net
MXalt2.aspmx.l.google.com
A2a00:1450:4025:c01::1a ๐Ÿ‡ต๐Ÿ‡ฑ Google
PTRrd-in-f26.1e100.net
A142.250.147.27๐Ÿ‡บ๐Ÿ‡ธ Google
PTRrd-in-f27.1e100.net
MXalt3.aspmx.l.google.com
A2a00:1450:4010:c0e::1b ๐Ÿ‡ซ๐Ÿ‡ฎ Google
PTRlu-in-f27.1e100.net
PTRlu-in-x1b.1e100.net
A74.125.131.27๐Ÿ‡บ๐Ÿ‡ธ Google
PTRlu-in-f27.1e100.net
MXalt4.aspmx.l.google.com
A2a00:1450:4013:c1e::1b ๐Ÿ‡ณ๐Ÿ‡ฑ Google
PTRyugrqzs-in-f27.1e100.net
A192.178.213.27๐Ÿ‡บ๐Ÿ‡ธ Google
PTRyugrqzs-in-f27.1e100.net
A154.0.169.94๐Ÿ‡ฟ๐Ÿ‡ฆ Afrihost
PTRstarhawk.aserv.co.za

co.za

MXmx2.dns.business
NSns2us.dns.business
NScoza1.dnsnode.net
NSns.coza.net.za
NSns2.dns.net.za
NSns5.dns.net.za
A196.29.59.156๐Ÿ‡ฟ๐Ÿ‡ฆ ZA Central Registry
rank #623051 globally
rank #948 in the tld

Starts with same word

Starts similarily

AI analysis

bmsprojects.co.za points to a single IP number: 154.0.169.94.

other host names for instance sautech.za.net, spamtitan2.sautech.za.net, spamtitan.sautech.za.net, safetycamo.com and mail.sautech.net share IP numbers with bmsprojects.co.za.

bmsprojects.co.za is delegated to four name servers: ns.otherdns.com, ns.otherdns.net, ns.dns1.co.za and ns.dns2.co.za.

bmsprojects.co.za at least partially shares name servers with other domains, for instance upcsa-cdp.org.za, f64.co.za, tlsinter.com, tapinoli.com and sirenpolewear.com.

Host names with three IP numbers:

ns.otherdns.com points to 2001:19f0:7400:1a54:5400:3ff:fee2:36a5, 41.215.232.12 and 104.238.171.99; ns.otherdns.net points to 2001:19f0:6402:4eb:5400:1ff:fea2:bf1f, 149.28.240.39 and 154.0.6.120; ns.dns1.co.za points to 2406:da11:f5d:500:bbed:25d3:3efe:555a, 13.245.235.13 and 169.1.2.99; ns.dns2.co.za points to 2c0f:f4c0:2000:100::53, 102.37.116.18 and 197.242.144.5.

bmsprojects.co.za is handled by five mail servers: aspmx.l.google.com, alt1.aspmx.l.google.com, alt2.aspmx.l.google.com, alt3.aspmx.l.google.com and alt4.aspmx.l.google.com.

bmsprojects.co.za shares mail servers with other domains at least partially, including piha.co.uk, carronetworks.com, loopgis.com, phones4less.net and thebeyond.net.

these mail servers are often used with aspmx2.googlemail.com and aspmx3.googlemail.com.

Hosts with two IP numbers:

aspmx.l.google.com points to 2607:f8b0:4023:c06::1b and 142.250.141.26.

alt1.aspmx.l.google.com points to 2a00:1450:4013:c1e::1a and 192.178.213.26.

alt2.aspmx.l.google.com points to 2a00:1450:4025:c01::1a and 142.250.147.27.

alt3.aspmx.l.google.com points to 2a00:1450:4010:c0e::1b and 74.125.131.27.

alt4.aspmx.l.google.com points to 2a00:1450:4013:c1e::1b and 192.178.213.27.

Perform reverse DNS lookup as well as normal forward DNS. Check Autonomous System Numbers (ASNs) and BGP connections between Internet Service Providers.
dbq

AboNaAm CF johedugfp 2025-10-22